
Matt:e EVU-1-100-TP 3 Phase EV Connection Unit with built in O-PEN Suitable for 1 x100A TPN Load
SKU EVU-1-100-TP
Availability:
Dispatch in 2-3 Days
Original price
Original price
£1,074.35
-
Original price
£1,074.35
Original price
£895.29
Exc VAT
£1,074.35
Inc VAT
£1,074.35
-
£1,074.35
Current price
£1,074.35
£1,074.35
-
£1,074.35
Current price
£1,074.35
Matt:e EVU-1-100-TP 3 Phase EV Connection Unit with built in O-PEN Suitable for 1 x100A TPN Load
Product DescriptionThe matt:e EVU connection centres provide a simple to install dedicated EV connection centre, with built in O-PEN® technology, that allows for the connection of EV charge points to the PME earthing facility without the use of earth electrodes
Helping to facilitate compliance with BS:7671. 2018 Amendment 1, 2020 Regulation 722.411.4.1.(iii)
Features- Built in O-PEN® technology
- NO EARTH ELECTRODES REQUIRED
- Helps reduce disruptive and costly groundworks
- Removes the risk of striking buried services
- Simple wire in wire out connection
- Phase loss protection
- For 1 x 100A TPN load
- Mild steel IP4X enclosure
- Standard 1 Year parts warranty
Data Sheet:
Click Here for Data SheetInstruction Manual:
Click Here for Instruction Manual